{"id":8970,"date":"2026-07-13T06:40:57","date_gmt":"2026-07-13T06:40:57","guid":{"rendered":"https:\/\/estate818.com\/e818-release-8892\/"},"modified":"2026-10-15T05:15:58","modified_gmt":"2026-10-15T05:15:58","slug":"8-steps-house-construction","status":"publish","type":"post","link":"https:\/\/estate818.com\/en\/8-steps-house-construction\/","title":{"rendered":"8 Steps in the Home Construction Process | Estate 818"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-post\" data-elementor-id=\"8970\" class=\"elementor elementor-8970 elementor-6762\">\n\t\t\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-s339060a elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"s339060a\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-c339060a\" data-id=\"c339060a\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-w339060a elementor-widget elementor-widget-html\" data-id=\"w339060a\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"html.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h1>8 Steps in the Home Construction Process | Estate 818<\/h1><p>Estate 818\u2019s published process lists eight work stages. The exact materials, construction scope and handover requirements for a project are governed by its BOQ, drawings and contract.<\/p><ol><li><strong>Foundation<\/strong> \u2014 Foundation and below-ground work are carried out according to the project drawings, BOQ and agreed scope.<\/li><li><strong>Structure<\/strong> \u2014 Concrete and structural materials follow the specifications listed in the project BOQ and drawings.<\/li><li><strong>Roof<\/strong> \u2014 Roof structure, covering and accessories follow the project BOQ and drawings.<\/li><li><strong>Ceiling<\/strong> \u2014 Ceiling materials and finish follow the project BOQ and drawings.<\/li><li><strong>Electrical system<\/strong> \u2014 Electrical work follows the agreed project documents and applicable requirements listed for that project.<\/li><li><strong>Doors and windows<\/strong> \u2014 Types, materials and allowances are as listed in the project BOQ and drawings.<\/li><li><strong>Bathroom and kitchen<\/strong> \u2014 Fixtures and materials are checked against the project BOQ and contract.<\/li><li><strong>Inspection and handover<\/strong> \u2014 Review the completed work against the drawings, BOQ and contract before handover. Warranty coverage and start dates are stated in the project warranty certificate.<\/li><\/ol><p>For materials, see the <a href=\"\/en\/boq\/\">BOQ<\/a>. For warranty terms, see the <a href=\"\/en\/work-warranty-certificate\/\">warranty page<\/a>.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>Review the eight published construction stages, from foundation to handover. Project materials and scope follow the BOQ, drawings and contract.<\/p>\n","protected":false},"author":1,"featured_media":8893,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-8970","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-1","wpbf-post"],"_links":{"self":[{"href":"https:\/\/estate818.com\/en\/wp-json\/wp\/v2\/posts\/8970","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/estate818.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/estate818.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/estate818.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/estate818.com\/en\/wp-json\/wp\/v2\/comments?post=8970"}],"version-history":[{"count":1,"href":"https:\/\/estate818.com\/en\/wp-json\/wp\/v2\/posts\/8970\/revisions"}],"predecessor-version":[{"id":9062,"href":"https:\/\/estate818.com\/en\/wp-json\/wp\/v2\/posts\/8970\/revisions\/9062"}],"wp:attachment":[{"href":"https:\/\/estate818.com\/en\/wp-json\/wp\/v2\/media?parent=8970"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/estate818.com\/en\/wp-json\/wp\/v2\/categories?post=8970"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/estate818.com\/en\/wp-json\/wp\/v2\/tags?post=8970"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}